General information about the ground area |
---|
Planned use of ground area | Placement of a manufacturing enterprise (production of building materials, repair of equipment) |
Branch | Manufacturing industry |
Address of the area | Krasnodar region, Novokubansky district, Novokubansk city, Novatorov street, 1 |
Cadastre account of ground area | Registered |
Cadastre number of area/of quarter | 23:21:0401017:182 |
Declared area (m2) | 25032.00 |
Limit size of the area (m2) | 25032.00 |
Land category | Lands of inhabited localities |
Kind of allowed use | Business building |
Actual use | For the production of building materials |
Permits, town-planning documentation | The master plan was approved by the Decision of the urban settlement of March 24, 2014 No. 553 (introduction of changes to the Decision of the urban settlement of August 21, 2015 No. 138). Rules of land tenure and building of 01.08.2014 ¹585 (introduction of changes from 19.02.2016 ¹95) |
Information on a property |
---|
Short description of property | None |
Cost of property, million rub. | |
Information about proprietor (right holder) |
---|
Proprietor | State property Rent of the land: ZAO Remtehnika INN: 2343002776, lease agreement ¹2100005620 dated 01.03.2013 for 49 years |
Right holder | Administration of municipal formation Novokubansky District |
Kind of right | Rent |
Information on the bankrupted enterprises |
---|
Name of bancrupcy procedure, date of introduction | None |
Market cost of the real estate (according to the report on an assessment in case of its carrying out). Total cost | |
Cost of land plot property | |
Information on carrying out an assessment | None |
Information on carrying out (planning) of the auction on sale of the deptor`s property | None |
Initial price | |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | The building for production, with an area of 2557.5 square meters, ZAO Remtehnika INN: 2343002776, certificate of state registration of the right 23-AM No. 104893 dated December 25, 1993 |
Encumbrance area | 2557.50 |
Electricity supply |
---|
Power supply center (name, right-holder) | JSC "NESK" |
Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
Power supply center (free power (MWt)) | 0.65 |
Power supply center (distance(m)) | 1500.00 |
Nearest connection point (network tension, kV) | 0.40 |
Nearest connection point (distance(m)) | 50.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | PJSC "Gazprom" GDS Novokubansk |
Gas pipeline (diameter(mm)) | 100.00 |
Gas pipeline (pressure(MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Gas pipeline (carrying capacity(cube. m.in a year)) | 10000.00 |
Gas pipeline (distance(m)) | 5760.00 |
Nearest connection point (diameter(mm)) | 100.00 |
Nearest connection point (pressure (MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Nearest connection point (carrying capacity (cubic meter a year)) | 8500.00 |
Nearest connection point (distance(m)) | 60.00 |
Water-supply |
---|
Water supply source (name, right-holder) | Municipal Unitary Enterprise "Novokubansky City Vodokanal" |
Water supply source (power (cubic meters a day)) | 5000.00 |
Water supply source (quality of water) | Service and drinking water |
Water supply source (distance(m)) | 750.00 |
Nearest connection point (power (cubic meters a day)) | 325.50 |
Nearest connection point (diameter(mm)) | 80.00 |
Nearest connection point (distance(m)) | 120.00 |
Sewage system |
---|
Type of building (name, right-holder) | Local treatment facilities |
Type of building (power (cubic meters a day)) | |
Type of building (distance(m)) | |
Nearest point of connection (power (cubic meters a day)) | |
Nearest point of connection (diameter(mm)) | |
Nearest point of connection (distance(m)) | |
Installation of telephones/internet |
---|
Central network (distance(m)) | |
Mobile communication (distance(m)) | |
Rated price of the ground area supplying with engineering, mln.rub. | |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | The name | Distance (km) |
---|
Center of municipal formation | Novokubansk city | |
Nearest settlement | Novokubansk city | |
Center of the subject of federation | Krasnodar city | 207.00 |
Highways (regional, federal value) | FAD «Caucasus» | 13.50 |
Highways of local value | Novokubansk city - Armavir city | 0.50 |
Nearest railway station | Kubanskaya station | 9.50 |
Nearest railway | Kubanskaya station | 9.50 |
Airport | Krasnodar airport | 207.00 |
Seaport | seaport Tuapse | 290.00 |
Additional information about the ground area |
---|
Special conditions | The relief of the site is calm, the level of groundwater is at a depth of 5.0 m. In the upper part of the section, subsidence subsidence. The dominant wind direction is southeastern. Seismicity of 7 points. |
Conditions of investor participation | Rent |
Cost of rent/buy of the ground area, mln. rub. | 0.23 |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 45.075555 |
Longitude (E) | 41.092819 |
Notes | None |
Data on the project initiator (in case of existence information about the legal/physical person) |
---|
Name / Full name | Municipal administration Novokubansky district |
Postal address | 352240, Krasnodar region, Novokubansky district, the city of Novokubansk, Street Pervomajskaya, 151 |
Site | www.invest-novokubansk.ru |
Phone/fax | (86195) 3-18-09, (86195) 3-25-62 |
E-mail address | economnovokub@yandex.ru |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | Municipal administration Novokubansky district |
Postal address | 352240, Krasnodar region, Novokubansky district, the city of Novokubansk, Street Pervomajskaya, 151 |
Site | www.invest-novokubansk.ru |
Phone/fax | (86195) 3-18-09, (86195) 3-25-62 |
E-mail address | economnovokub@yandex.ru |